8 March 2008
Foundations of section 1 have been made and base shapes are taking form.








25 February 2008
All blocks have been dug out on section 1 and the currently the foundations of all blocks are being made
with steel wiring and concrete.
The foundation of Section 1, B-block is completed.





|